Zhone IMA CS-200 System Especificações Página 40

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 39
2-2 Reference Guide
Model No.
Running Head
Introduction System Installation
1. Choose a suitable location for the system, as described in this chapter.
2. Unpack and inspect the equipment for damage.
3. Mount the chassis on the desired surface (rack, tabletop, or wall).
4. Set the chassis jumper for U.S. or European operating voltage compliance.
5. Remove the power supply covers from the chassis.
6. Install the chassis ground connections.
7. Install the AC or DC power supplies.
8. Install an AC-to-DC converter (if necessary).
9. Install a ringing generator (if necessary).
10. Install a CPU card.
11. Install the Interface card.
12. Install the WAN cards.
13. Install server cards, as required.
14. Install the user (voice, data, and alarm) cards, as required.
15. Verify the voltage ratings of all power supplies in the chassis.
16. Verify the fuse ratings of all power supplies.
17. Apply power to the system and verify the power LED states.
18. Install the power supply covers on the chassis.
After successfully installing the system, configure the system for operation as follows:
1. Connect a VT100-compatible terminal to the Interface card.
2. Log into the system, then register.
3. Set the Alarm Filters.
4. Configure the CPU card.
5. Configure the Interface card.
6. Configure the WAN cards.
7. Configure all other cards.
Vista de página 39
1 2 ... 35 36 37 38 39 40 41 42 43 44 45 ... 301 302

Comentários a estes Manuais

Sem comentários